Scalable Aerospace Data Archiving Project Eliminated Legacy Liabilities in 3 Months

Application: Product Inventory Control Systems

Industry: Aerospace Manufacturing

The Challenge:

To implement on a trial basis an archiving solution that would:

  • Eliminate liability of legacy systems
  • Quickly replace a system facing imminent withdrawal of database support
  • Create cost-effective, reliable access to data
  • Maintain compliance with data regulations
  • Scale across multiple systems due for retirement

The Result:

  • Pilot project completed in 3 months, after which DataNovata was deployed within the client live environment
  • Client enabled to switch off the old server and eliminate associated legacy costs
  • DataNovata application was fully compliant accessing the SQL server database
  • Client deployed another 6 instances after the pilot success and continues to increase the footprint across its global network of companies
Read The Full Case Study

Auto Manufacturing

Read our Auto Manufacturing case studies below.

Top 3 Auto Manufacturer Sees 30% Improvement in Operational Efficiency

Application: IBM Mainframe Platform

Industry: Auto Manufacturing

The Challenge:

  • Decommission multiple applications with different stakeholders and operational resources with zero disruption to workflows
  • Manage the data history for 10 years to meet business & compliance needs
  • Provide a common solution for data access easily and affordably

The Result:

  • 40% reduction in resources needed to manage the server clusters
  • 30% improvement in user operational efficiency
  • 25% reduction in housekeeping operations
  • Deletion of 1500 screens for improved UX
  • Eliminated 600 tasks from the Job Controller
  • Transformed report production from 1 day to 1 minute
Read The Full Case Study

Healthcare Manufacturing

Read our Healthcare Manufacturing case studies below.

NSC Facilitated SAP Transition at Reduced Cost

Application(s): Infor BPCS, System 21, Data 3 and multiple other ERP solutions

Industry: Healthcare Manufacturing

The Challenge:

  • Merge all of the company’s non-SAP databases that were not required for SAP licence
  • Define a common data structure for all the database variants that was meaningful to the business user.
  • Segment the data application into relevant models e.g. Customer Care, Finance, Manufacturing.
  • Plan for worldwide implementation in multiple languages using VMware on an SQL platform.
  • Provide immediate access to all transaction and audit history
  • Eliminate the cost of the legacy hardware

The Result:

  • Project took less than 12 months from start to completion
  • Only 1 week needed to train business users on the DataNovata application
  • Client could successfully decommission its iSeries/AS400 platform with no loss of data integrity and accessibility
  • No additional licences were needed for SAP in order to maintain full access to the data
Read The Full Case Study Here

Manufacturing

Read our Manufacturing case studies below.

Office Supplies Enterprise Realises ROI within 9 months Post Merger

Application: Movex ERP, Basware

Industry: Manufacturing

The Challenge:

Deliver a data platform solution that would:

  • Consolidate datacenter operations by shrinking the legacy application hardware
  • Consistently interpret multiple platform applications' database schemas
  • Function independent of the original host
  • Accelerate decommissioning cycles
  • Not require re-skilling employees
  • Price below operation costs

The Results:

  • Delivery of data files to completion of UAT in 16 weeks
  • Data history was accessible independent of the legacy host
  • Datacenter consolidation goals were met through shutting down an entire datacenter
  • Rationalisation initiative helped the company reduce its infrastructure costs by 33% estimated at £40K p.a. on the first project
  • Invoice document scans from Basware were linked to the DataNovated Movex tables for easy reference
Read The Full Case Study

IMI PRECISION ENGINEERING REMOVE SECURITY THREAT AND ALLEVIATE RISK OF RUNNING LEGACY OS

Application: Various ERP - WS 2008 platform

Industry: Engineering/Manufacturing

The Challenge:

  • Transfer the data to a secure and supported platform
  • Ensure data accessibility to bills of materials for audit and analysis and continued customer support of legacy parts with full security support
  • Take the old legacy system out of service

The Result:

  • Removed any security threat and alleviated the risk of running on legacy operating systems
  • Allowed resources and manpower to be reallocated from maintaining and securing the old system to other projects
  • The DataNovata application could host additional fields or data that were not already included easily
  • Created cost savings due to retiring legacy licenses and cutting maintenance costs
  • The new system was easy and intuitive for the old users to operate
Read the Full Case Study

IMI PRECISION ENGINEERING SECURE DATA FOR FUTURE USE TO ENSURE CONTINUED CUSTOMER SERVICE

Application: Various ERP - WS 2008 platform

Industry: Engineering/Manufacturing

The Challenge:

  • Move the entire database to a secure, modern, generic database platform
  • Ensure that all of the complex data relationships and data structures of the bills of materials were intact and fully searchable
  • Ensure data accessibility for analysis and data retrieval

The Result:

  • All of the data was secured for future use to ensure continued customer service
  • IMI could now access design and inflation clause data of retired designs to match new parts to customers
  • Complex searches and parts tracing produced results in seconds vs hours
  • Customers are delighted with the dedication to service excellence
Read the Full Case Study

Online Advertising/Business Services

Read our Online Advertising/Business Services case study below.

Yellow Pages Reduced Outsourcing Costs by 70%

Application: Bespoke Application

Industry: Online Advertising/Business Services

The Challenge:

  • Replace the expensive 3rd-party managed services provider
  • Create a web-viewable copy of the database
  • Enrich the database indexing to support more meaningful data enquiries
  • Design an XML, Java-based, DataNovata application for dynamic, online analysis and reporting
  • Do so for listings containing 3 million business application records

The Result:

  • Project took 3 months from start to completion
  • Client was able to reduce the cost of outsourced analytics operations by 70% for the Business File application
  • The marketing unit could now interrogate data according to dynamic business needs without disrupting the core system workflow or high-volume users
Read The Full Case Study

P&C Insurance

Read our P&C Insurance case studies below

European Claims Adjuster Merges into a Common Application Data Governance

Applications: System 21 and Sun Accounts

Industry: P&C Insurance

The Challenge:

  • Dispose of multiple inherited systems
  • Bring all European offices under a common application data governance
  • Avoid data migration for non-transactional data
  • Support the detailed user requirements at a significant reduction in operating cost

The Results:

  • Initial pilot proof of concept was completed in a few weeks and the archiving solutions were completed, inclusive of user training, 6 weeks before new ERP system launch.
  • Closing balances only migrated to the new ERP (green field).
  • Data history accessible through the DataNovata apps on desktop and mobile
  • Minimal input from client IT Services allowed the client to focus on the new ERP system implementation.
Read The Full Case Study

RSA's Data Regulation Compliance Secured by DataNovata

Application: UK Ministry of Defense Employee Claims Management System

Industry: P&C Insurance

The Challenge:

  • Eliminate risk from the legacy data management
  • Manage compliance and reduce risk of system failure
  • Improve access to the source application history
  • Reduce the operational cost of data access

The Result:

  • Project completed in 3 months, using remote access to the HP/UX Server.
  • RSA decommissioned its legacy platform application
  • RSA retained the same level of accessibility through an up-to-date UI
  • Cost of data management was reduced by 60% in one year
Read The Full Case Study

Mission-critical Call Centre CSR System Re-platformed for Digital Access to Sales Data

Application(s): MR1 Call Centre Quotation System – IBM CICS

Industry: P&C Insurance

The Challenge:

  • Decommission a mission-critical system with 40G of historic data
  • Ensure that the user workflow would be replicated or improved
  • Ensure undisrupted continuity for 1300 registered users
  • Comply with data retention and availability rules

The Results:

  • Data fully migrated into a DataNovata application template, with full UAT and production cutover within 6 months of kickoff
  • No disruption for call centre users
  • Elimination of all associated costs of running on the mainframe
  • Continuous, uniform access to all data provided throughout the process
Read the Full Case Study

RSA Property Services Saves £40 K p.a. Accessing Data History

Application: AS400

Industry: P&C Insurance

The Challenge:

  • Decommission an AS400 operating all the Property Division’s leasehold and freehold data
  • Stop exporting the database to Excel sheets as a security precaution
  • Process 3 GB of data records into a read-only accessible data platform with full referential integrity

The Result:

  • Project completed in less than 3 months with all users transitioned to the new system
  • £40,000 p.a. of savings
  • AS400 shutdown
  • All data history accessed through DataNovata
Read the Full Case Study

Just 6 Weeks to Decommission Multiple Mainframe Legacy Databases

Application: IBM CICS

Industry: P&C Insurance

The Challenge:

  • Eliminate the cost of supporting the legacy mainframe while ensuring audit and query capabilities and compliance with data regulations
  • Transfer the company's entire policy transaction history, policy database and claims database to the new application and decommission the legacy databases.

The Result:

  • Policy database decommissioned in 2 ½ months
  • Claims database decommissioned in just 6 weeks
  • User access was maintained all throughout the decommissioning process
Read the Full Case Study

Public Sector

Read our Public Sector case studies below.

West Northamptonshire Council Mainframe Retired to Achieve System Upgrade ROI

Application(s): CTAX, HBIS, OAP, UniPay/PER, PALS, HREP

Industry: Public Sector

The Challenge:

  • Retire the Fujitsu VME mainframe within the upgrade timeline
  • Decommission applications even though they lacked documentation and source codes
  • Maintain direct access to the data
  • Avoid compromising the ROI benefits of the overall systems upgrade

The Result:

  • Project completed in 6 months via remote access to the VME mainframe and Windows Server.
  • Mainframe successfully retired while retaining direct access to the data
  • Client was able to fulfill their mandate
Read the Full Case Study

NSC Provided Flexibility for Diverse Data Accessibility Needs to Government Agency

Read our Online Advertising/Business Services case studies below.

The Challenge

  • Retire the VME mainframe
  • Allow the government officers immediate access to the system
  • Enable remote access
  • Incorporate accessibility features for disabled users to operate independently

The Result:

  • Decommissioning project took 6 months from start to completion
  • Disabled users now had ease-of-access to full application functionality from mobile devices
  • The time and effort for requests, approvals and providing financial support for winter heating was significantly reduced
Read the Full Case Study